Civil Infrastructure & Public Works ERP

Every Contract.
Every Measurement.
Every Rupee.

The authoritative infrastructure ERP engineered to stop revenue leakage across Running Account (RA) bills, automate L×B×D digital e-MB measurement sheets, enforce statutory recoveries (SD, GST-TDS, Labour Cess, Mobilization), and defend contractual claims under CPWD Works Manual & MORTH IRC protocols.

Start 7-Day Free Trial

₹100 Cr+

BOQs Structured

100%

Form 26 Compliant

Zero

Arithmetic Accuracy

NHAI Pkg-4 (Ch. 12+000 to 48+500)

EPC Mode • Division IV

CERTIFIED WORK POSITION
₹2,48,50,000Period Gross Certified
14.2% Executed
Awarded Value₹18.42 Cr
Approved Variations+₹12.40 L
Total Billed₹2.10 Cr
Net Disbursed₹1.88 Cr
Pending Certification

₹42.50 L

2 RA Bills at Division

Unbilled e-MB Entries

Ch. 14+200

Sub-grade verification

Active Site Deployment

94 Workforce

6 Excavators • 4 Rollers

STATUTORY & PROCUREMENT ENGINE

Pre-configured for Indian Government Engineering & Treasury Protocols

Compliant with CPWD Works Manual 2024, State PWD accounts code, and MORTH specifications.

CPWD Works Manual

Clause 7, 10CA, 10CC & EOT

Form 26 & 24

Standard Running Account Bills

IS 1200 / e-MB

Chainage & L×B×D Deduction Math

IRC & MORTH

Highway & Earthwork Tolerances

Statutory Tax

2% TDS, 2% GST-TDS, 1% BOCW Cess

BG & EMD Vault

Automated Expiry & Release Alerts

HOW IT WORKS: SITE TO TREASURY PIPELINE

From site engineer's mobile to the bank realization ledger in 4 automated steps

Eliminate disconnected WhatsApp groups, delayed measurement entries, and handwritten abstracts with an end-to-end audit chain.

Step 01Site Engineer

Chainage Measurements & Diesel Logs

Punch daily measurements by chainage (L×B×D), capture geo-tagged photo evidence, and log equipment diesel consumption offline on mobile.

Step 02Billing Engineer

Digital e-MB & BOQ Quantity Linkage

Auto-reconcile field measurements directly with sanctioned BOQ line items, calculate net quantities, and flag excess variations before JE scrutiny.

Step 03Accounts & HO

Form 26 RA Bill & Statutory Recoveries

Generate 1-click Form 26 with automated Security Deposit (5%), GST-TDS (2%), BOCW Cess (1%), and Mobilization Advance schedules.

Step 04Contractor / MD

Treasury Realization & Dispute Defense

Track net bank realizations, monitor Bank Guarantee (BG) expiry alerts, and issue automated delay notices before statutory time-bars.

ENGINEERED FOR THE GROUND REALITY

Four Pillars built to stop revenue leakage across site packages

No generic spreadsheets or consumer task lists. Every calculation respects Indian contractor accounting, tax deduction protocols, and departmental measurement approvals.

Pillar 01

Contract & BOQ Master

Import tender BOQs in minutes. Monitor item rate ceilings, track quantity variations (+/-), and apply automated CPWD 10CA/10CC price escalation indices without manual re-keying.

BOQ Item & DescriptionTender vs Executed (cum)
Item 4.04: R.C.C. M-25 in Foundation & PiersWithin Limit (72.6%)
Tender: 4,200.00 cumExecuted: 3,050.00 cumRate: ₹6,450 / cum
Item 7.11: Granular Sub-base Course (Grade-II)Variation Approved (+12.4%)
Tender: 18,500.00 cumCurrent: 20,795.00 cumImpact: +₹24,12,000
Pillar 02

Measurements & Digital e-MB

Empower site engineers to punch daily field measurements directly by chainage. Automated L×B×D deduction math prevents arithmetic queries from departmental Junior Engineers (JEs).

e-MB Sheet No. 491 • Page 18Status: JE Verified
Chainage: 12+400 to 12+550 (LHS)Structure: Culvert No. 4 Wingwall
L: 24.50m × B: 3.20m × D: 0.45m35.28 cum
GPS: 28.3871° N, 79.4326° EDigital Sign: V. Sharma
Pillar 03

Running Account (RA) Bills & Deductions

Generate 100% compliant CPWD Form 26 and State PWD bills with a single click. Every statutory recovery—Security Deposit, GST-TDS, Labour Cess, and Mobilization recovery—is auto-computed.

Form 26 RA Bill Voucher • Ref: NHAI/4L/RA/03Due in 3 Days
Gross Value of Work Done (A)₹1,15,48,000
Less: Mobilization Advance Recovery (10%)-₹11,54,800
Less: Security Deposit / Retention (5%)-₹5,77,400
Less: Statutory TDS & 1% Labour Cess-₹2,38,600
Net Payable to Contractor₹95,78,200
Pillar 04

Site Operations & ContractIQ Assistant

Log daily site muster rolls, diesel logs for machinery, and cement store balance. ContractIQ cross-checks field events against your agreement clauses in English and Hindi.

ContractIQ Dispute & Clause EngineClause Check: Active
Today's Manpower84 Labour (4 Gangs)
Machinery & Diesel6 Excavators (420 L)
ContractIQ Statutory Advisory

"Notice: RA Bill #08 has been pending certification for 14 days at the Division Office. Under CPWD Clause 7, you are eligible to claim interest on delayed payments beyond 10 days."

1-Click

Form 26 & e-MB Generation

Instant export of statutory CPWD/State PWD bill vouchers, deduction schedules, and measurement abstracts.

99.4%

Billing Arithmetic Accuracy

Zero rejections caused by chainage overlap, SOR code discrepancies, or tax miscalculations.

4.2x Faster

RA Bill Certification Turnaround

Contractors slash their average submission-to-disbursement window from 45 days down to 11 days.

Transition from Excel & Physical Measurement Books

Ready to modernize your civil contracting operations?

Built for highway, building, and irrigation contractors running efficient, dispute-free projects with real-time cash flow visibility.

Start 7-Day Free Trial

No credit card needed • Fast 1-day onboarding for existing project BOQs • Free data migration assistance